|

Engine & gearbox being removed
|

|
|

Gearbox ready for rebuild
|

Engine to be rebuilt
|
|

Gearbox being stripped
|
 |
|

2nd gear worn syncro ring
|

All new bearings being fitted
|
|

Gear cluster rebuilt
|

Over drive unit rebuilt
|
|

Finished rebuilt gear box
|

Engine being stripped
|
|

Worn valve guides
|

One stripped and cleaned head
|
|

Blocked water ways being cleaned out
|

Original Borgo pistons worn
|
|

New piston rings
|

New liners fitted
|
|

New liners and pistons assembled in block
|

New modified valve guides fitted in heads
|
|

Rebuilt heads
|

Heads going back on
|
|

Valve clearances being set up
|

Finished engine
|
|

Finished engine and gear box
|

Engine bay tired
|
|

Paint being stripped
|

Zinc primer base coat
|
|

Zinc primer base coat
|

Finished painted engine bay
|
|

Painted front valance
|

Interior carpets & underlay removed
|
 |

Boot stripped and painted
|
|

Gear box fitted
|

Engine going back in
|
 |

Interior going back together
|
|

Engine in being connected
|

The finished engine
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
The finished car
|